Wai’anae Project: Getting ready to start project, erecting the 20 ft prefabricated panels.
3-D Panel being readied to erect. The foam is being removed from the end so the rebar will fit into the panel.
At this phase, the foam has been removed prior to standing, the floor will connect at this point, we will create a concrete bond beam.
In this image, observe how the wire is used to help raise the panels, this being the gable end the panels were twenty feet long.
Applying the flat mesh, this connects the panels together, this is used on both sides of the panels.
Installing the gable end with panel over rebar.
Burning the foam to allow concrete to flow around the rebar tie down. Note: the hog ring tool to the right of the man burning foam, this tool is used to fasten panels together.
Insteel 3-D Panels, the home is now coming together.