logo
  • Call Us(707) 230-6046
  • Contact Us
  •  Home
  • Projects
    • Fire Resistant Homes
    • Habitat for Humanity
      • Disaster Resistant Homes
        • International Projects
        • Dome Homes
          • Custom Countertops
            • Bar-B-Ques & Seatings
            • Unique Ideas
  • Concrete Walls
    • Sound Walls
      • Hopper Wall Santa Rosa
        • Concrete Homes DIY
          • DIY Concrete Scaffolding
            • ICF or SCIP Construction?
  • Concrete Admixture
    • Hopper Sprayers
      • Equipment
  • Tech Specs
    • How to Estimate Cost
    • Structural Specs
    • Disaster Resistant Architecture
    • FAQ
  • Testimonials
    • Training Testimonial
    •  Gallery
  • Contact Us
    • Associates
    • Privacy Policy
    • Careers
Tridi Panel
  • Home
  • Projects
    • Fire Resistant Homes
    • Habitat for Humanity
      • Disaster Resistant Homes
        • International Projects
        • Dome Homes
          • Custom Countertops
            • Bar-B-Ques & Seatings
            • Unique Ideas
  • Concrete Walls
    • Sound Walls
      • Hopper Wall Santa Rosa
        • Concrete Homes DIY
          • DIY Concrete Scaffolding
            • ICF or SCIP Construction?
  • Concrete Admixture
    • Hopper Sprayers
      • Equipment
  • Tech Specs
    • How to Estimate Cost
    • Structural Specs
    • Disaster Resistant Architecture
    • FAQ
  • Testimonials
    • Training Testimonial
    • Gallery
  • Contact Us
    • Associates
    • Privacy Policy
    • Careers

Hi’ilani Eco House – Hawaii

A template was made with the exact pitch and length of roof on these benches.

A template was made with the exact pitch and length of roof on these benches.

The end or edge of the roof is formed with a 2

The end or edge of the roof is formed with a 2″ x 12″ and a 2″ x 8″ the outside edge of the roof will be 12 inches wide, the foam will be removed just in the front of the two #3 rebar’s. You can see a black line there, this will be done before the panels are set in place.

The wire corner mesh will be fastened to the end of the panel, also before installing, also the foam will be removed from the lower or valley end of the Tridipanel. The wire mesh will be fastened to this end also prior to placing the Tridipanels on the roof forms, the rebar will then be installed.

The wire corner mesh will be fastened to the end of the panel, also before installing, also the foam will be removed from the lower or valley end of the panel. The wire mesh will be fastened to this end also prior to placing the panels on the roof forms, the rebar will then be installed.

Rod Hadrian Jr. lay's a 14' long rebar across form at the valley, this rebar was spaced every 6

Rod Hadrian Jr. lay’s a 14′ long rebar across form at the valley, this rebar was spaced every 6″, this panel roof will cantilevers approximately fifteen feet out from glass line and this is why we have the additional rebar’s, also this end of the roof is subject to hurricane force wind loads.

Julio on the roof inspecting the rebar layout prior to starting the Tridipanel installation.

This view shows the form at the valley of the roof, the foam is removed from the Tridipanels, the concrete will be pumped in from the topside, the red duct tape covers the crack between the form lumber.

This view shows the form at the valley of the roof, the foam is removed from the panels, the concrete will be pumped in from the topside, the red duct tape covers the crack between the form lumber.

The rebar's are 14' feet long with seven feet extended in each direction, each Tridipanel is twelve feet in length, a total roof with twenty-four feet wide, the foam is removed 4

The rebar’s are 14′ feet long with seven feet extended in each direction, each panel is twelve feet in length, a total roof with twenty-four feet wide, the foam is removed 4″ inches back from the exterior edge, the edge will also be poured completely around the roofs perimeter.

Two inches of Portland cement will be sprayed over the bottom sides of the Tridipanels with one and a half inches of Portland cement will be placed on the topside of the roofs.

Two inches of Portland cement will be sprayed over the bottom sides of the panels with one and a half inches of Portland cement will be placed on the topside of the roofs.

Rod Jr. built this ramp to carry the roof panel up to the roof.

Rod Jr. built this ramp to carry the roof panel up to the roof.

Installing Tridipanel roofs, all of the Tridipanels were installed in one day on roof #3.

All of the Tridipanels were installed in one day on roof #3.

The first Tridipanels installed on the roof, the guys inspecting their work.

The first panels installed on the roof, the guys inspecting their work.

Fastening down the Tridipanel, this roof length is approximately sixty feet long with the last fifteen feet free spanned out with no columns for support.

Fastening down the panel, this roof length is approximately sixty feet long with the last fifteen feet free spanned out with no columns for support.

Two inches of Portland cement will be sprayed over the bottom sides of the Tridipanels with one and a half inches of Portland cement will be placed on the topside of the roofs.

The last few panels have double #5 rebar installed, you can also see the foam removed where we will create a concrete beam here to increase the roof strength in this area.

A view from below, the rebar is extended seven feet in each direction from the valley.

A view from below, the rebar is extended seven feet in each direction from the valley.

A view of the Tridipanel roof from the top, Freddy is applying the flat mesh to hold the panels together.

A view of the panel roof from the top, Freddy is applying the flat mesh to hold the panels together.

Rod Hadrian Jr. checking out the finished Tridipanel roof.

Rod Hadrian Jr. checking out the finished Tridipanel roof.

Pages: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9


  • Next Project

About Us

Mr. Hadrian is a GC, with over two decades building and training worldwide, with the Tridi Panel Building System. Our Best Services include assisting builders, architects and engineers with the planning, costing, and architectural design, as well as answering questions for existing or future projects.

 

Projects

  • Former President Jimmy Carter
  • Dome Homes
  • Landscape Walls
  • Sound Walls
  • Unique Ideas
  • Bar-B-Ques & Seatings
  • Hi'ilani Eco House

Links

Hubbell Architects

SCIP Concrete Wall Builder

Tetrapore Concrete Additive

Contact Us

 

  • (707) 230-6046
  • info@tridipanel.com
  • Monday - Friday : 9:00 - 7:00
  • Careers
Trademark and Copyright © 1999-2022
All rights reserved.