logo
  • Call Us(707) 230-6046
  • Contact Us
  •  Home
  • Projects
    • Fire Resistant Homes
    • Habitat for Humanity
      • Disaster Resistant Homes
        • International Projects
        • Dome Homes
          • Custom Countertops
            • Bar-B-Ques & Seatings
            • Unique Ideas
  • Concrete Walls
    • Sound Walls
      • Hopper Wall Santa Rosa
        • Concrete Homes DIY
          • DIY Concrete Scaffolding
            • ICF or SCIP Construction?
            • Hopper Sprayers
            • Equipment
  • Tech Specs
    • How to Estimate Cost
    • Structural Specs
    • Disaster Resistant Architecture
    • -EVG 3D
  • Testimonials
    • Training Testimonial
    •  Gallery
  • Contact Us
    • Associates
    • Privacy Policy
    • Careers
Tridi Panel
  • Home
  • Projects
    • Fire Resistant Homes
    • Habitat for Humanity
      • Disaster Resistant Homes
        • International Projects
        • Dome Homes
          • Custom Countertops
            • Bar-B-Ques & Seatings
            • Unique Ideas
  • Concrete Walls
    • Sound Walls
      • Hopper Wall Santa Rosa
        • Concrete Homes DIY
          • DIY Concrete Scaffolding
            • ICF or SCIP Construction?
            • Hopper Sprayers
            • Equipment
  • Tech Specs
    • How to Estimate Cost
    • Structural Specs
    • Disaster Resistant Architecture
    • -EVG 3D
  • Testimonials
    • Training Testimonial
    • Gallery
  • Contact Us
    • Associates
    • Privacy Policy
    • Careers

Auto Dealership Sound Wall

Fire Resistant Roel wall built as a security wall around an auto dealers car storage lot. Hadrian Construction. Co was selected by the owners of this dealership to install the wall system using 3d Cementitious sandwich panels.

Hadrian Tridipanel Systems installs a continuous 1 foot by 2 foot six inches wide continuous footing, normally we would just use steel pipe ten feet on center four feet deep because of numerous underground utilities, we stayed with the 12 inch footings.

By using the 2 and a 1/2 inch galvanize pipe ten feet on center it speeds up the installation of the 3-D Panels. Bill Hadrian installing the 3-D Panels.

The 3-D Panels were pre-cut to size, the 3-D Panels are four foot wide by ten foot were cut in half long ways, they are shown installing a two foot by ten foot panel on the bottom, a number foot rebar is staggered two feet on center.

This complete 700 foot plus long 3-d panel wall six foot high was installed in one day, the small pieces of panel left over were used to make the columns which were installed the following day, all of the product was pre-cut to size by Hadrian Tridipanel Systems.

This is Bill Hadrian burning away foam to allow shotcrete mortar mix to lock in behind the number four rebar.

Some of the foam has been removed around the 2.5 inch galvanize pipe. The shotcrete will create a concrete post here.

Setting the wire mesh corner beads, the corner beads are used by the plastering industry this helps keep the cement mortar mix or shotcrete level and true with less labor, the cap being set level.


  • Previous Project
  • Next Project

About Us

Mr. Hadrian is a General Contractor, with over two decades building and training worldwide, with the SCIP structural concrete insulated panel building system. Our Best Services include assisting builders, architects and engineers with the planning, costing, and architectural design, as well as answering questions for existing or future projects.

 

Projects

  • Former President Jimmy Carter
  • Dome Homes
  • Landscape Walls
  • Sound Walls
  • Unique Ideas
  • Bar-B-Ques & Seatings
  • Hi'ilani Eco House

Links

Hubbell Architects

SCIP Concrete Wall Builder

Green Home Building

Contact Us

 

  • (707) 230-6046
  • info@tridipanel.com
  • Monday - Friday : 9:00 - 7:00
  • Careers
Trademark and Copyright © 1999-2022
All rights reserved.